Pinnacle was selected to complete a buildout of new classrooms on the upper level at the North Campus of St. Paul’s Lutheran School. Scope of work for this 3,700 SF project included selective demolition, rough carpentry, plastic laminate faced architectural cabinets, firestopping, joint sealants, doors/frames/hardware, glazing, non-structural metal framing, gypsum board, acoustical panel ceilings, resilient base and accessories, resilient tile flooring, interior painting, visual display surfaces, metal lockers, mechanical, fire protection, HVAC, air distribution, electrical, and communications.

*Pinnacle has recently completed new classroom upgrades for the school. Two existing classrooms were upgraded to better serve the students and staff, including the addition of new ADA accessible sinks with bubblers, new countertops & backsplash, new cubbies for student storage, and reconfiguration of the teaching wall smartboards and marker boards to maximize teaching space.

  • Client: St. Paul’s Lutheran Church
  • Project: North Campus – Upper Floor Classroom Finish & Classroom Renovation
  • Architect: Cordogan Clark
  • Location: Des Peres, Missouri
click an image to view larger