Pinnacle was selected to complete a buildout of new classrooms on the upper level at the North Campus of St. Paul’s Lutheran School. Scope of work includes selective demolition, rough carpentry, plastic laminate faced architectural cabinets, firestopping, joint sealants, doors/frames/hardware, glazing, non-structural metal framing, gypsum board, acoustical panel ceilings, resilient base and accessories, resilient tile flooring, interior painting, visual display surfaces, metal lockers, mechanical, fire protection, HVAC, air distribution, electrical, communications.

  • Client: St. Paul’s Lutheran Church
  • Project: North Campus – Upper Floor Classroom Finish
  • Architect: Wm. B. Ittner, Inc.
  • Location: Des Peres, Missouri
click an image to view larger