Napleton Chrysler Mid Rivers

Pinnacle was the general contractor for a new addition and renovation to the existing Chrysler Mid Rivers dealership in St. Peters, Missouri. A new service drive, new showroom/new car delivery, and a new customer lounge were added to enhance the customer experience. In addition to general contracting services, Pinnacle was responsible for coordinating all site operations throughout the 7-month phased project. Phase I of the project consisted of work to the service bays, and Phase II consisted of renovations to the showroom. Pinnacle worked to meet the owner’s needs by completing Phase II in time for Black Friday sales. This was the 3rd project that Pinnacle has completed for this client, and the 2nd at this location.

The sitework at Mid Rivers Chrysler consisted of work on a 2.8 acre site that was developed into a parking lot with 240 parking spaces. Site lighting was added as well as installation of 2 bio ponds and a rock infiltration trench for storm water.

Be sure to check out the Illinois Business Journal’s recap of the project here: http://ow.ly/e4J450ypMxX as well as in this article featured in the Saint Louis CNR: http://ow.ly/NoiC50ysx0E

Napleton Pre-Owned Site Development & Parking Lot Extension

Pinnacle’s fourth project for the Napleton Group was the site development and parking lot extension for the Napleton Pre-Owned property, formerly known as Granada Cyclery. The scope of work included a full build out of the undeveloped land adjacent to the existing developed property, modifications to existing and relocation of entry drive, and replacement of existing site lighting/installation of new site lighting.

Napleton Off-Lease

Pinnacle also worked as the general contractor on the Napleton Off-Lease Missouri project to renovate the existing 5,735 SF building. Located in St. Peters, interior work on this project included demolition of existing mezzanine level, HVAC and electrical upgrades, construction of a vehicle photobooth and detail bay, remodeling the existing restrooms and showroom. Exterior work included a new ACM façade, new portal build-outs with integrated signage, replacement of storefront glazing for vehicle access into the showroom and detail bay, construction of new vehicle access to photobooth, new footings for portal supports, providing a sand/oil separator and re-striping adjacent parking spots to accommodate new work. These renovations have created a sleek and inviting space for customers and employees alike.

Napleton St. Peters Honda – Service Bay Expansion

Pinnacle has recently completed the Napleton St. Peters Honda – Service Bay Expansion. This 12,000 SF project included a new shop addition, photo booth, detail area, and a mezzanine. The project involved partial building demolition, rerouting of storm and sanitary lines, CMU wall construction, steel roof joists, epoxy floors, and HVAC & Electrical upgrades. This was all completed by working with an existing operating facility.

Napleton Kia – Urbana, IL

Located in Urbana, IL, this project for Napleton Kia involved a complete interior and exterior renovation to the existing 6,300 SF building and two new additions totaling 2,490 SF. Site work entailed utilities, grading, concrete, asphalt, and landscaping. Demolition involved façade removal and some interior materials as indicated on the plans. The new building additions are steel framed/joists, ACM, EIFS, and membrane roof to create a sales showroom and vehicle delivery building with a customer service drop-off area. All service work will be done at the existing remote shop facility.

  • Client: Ed Napleton Automotive Group
  • Project: Chrysler Mid Rivers – Sitework and Office Renovation, Site Development for Granada Cyclery, Off-Lease Building, St. Peters Honda Service Bay Expansion
  • Location: St. Peters, Missouri
click an image to view larger